Pre-Wiring for Motorized Shades: What to Do Before the Drywall
Motorization•Updated Sep 17, 2026•5 Min Read
If your walls are still open, this is the cheapest hour you will ever spend on window treatments. Power at the window means shades that never need charging, nothing visible in the finished room, and no regret about the one window nobody can reach. Here is what to run, where, and when.

The short version
Every motorized shade needs power, and there are only two ways to get it to the motor: a battery inside the shade, which wants a USB recharge every four to six months for as long as you own it, or a wire in the wall, which you never think about again. The wire costs almost nothing while the walls are open and a great deal afterwards — so the real content of this article is a deadline, not a technique: decide before the drywall goes up.
24V, PoE or 110V?
| Option | What to run | Where it works | The trade-off |
|---|---|---|---|
| 24V low voltage | A low-voltage supply terminating at the motor end of each opening | Everywhere. It is what most of our Matter motors run on, it hides in a slim head detail, and it is safe to work around. | Connectors and transformer placement vary by manufacturer — confirm the spec before it is run. |
| PoE (Power over Ethernet) | A Cat6 run from the network rack to the motor end of each opening | Everywhere, and further than low voltage can reach — a single run can cross the whole house. Our PoE motors take the cable directly, with no transformer or splitter in the head. | It needs a PoE switch with enough budget for every motor on it, and it ties the shades to the network rack rather than a simple supply. |
| 110V household power | A standard outlet at the head of the opening, concealed within the frame | Everywhere too. This is not a capability limit — a 110V motor will do the same job at the same openings. | It costs more per opening for almost nothing you do not already get from 24V: an electrician, a box and an outlet each time, and an outlet is bulkier to hide. |
Why 24V rather than 12V
Low-voltage shade motors used to be 12V, and plenty of older installations still are. At double the voltage the same motor draws half the current, and halving the current buys two things that matter once the cable has to cross a house: it can be thinner for the same job, and it can be far longer before voltage drop starts to slow the motor at the end — roughly four times longer. On a 12V house that limit usually means several supplies scattered around to stay close to the openings. On 24V it is often one.
Where the power has to land
This is the one detail worth getting exactly right, and it is geometric rather than electrical: the motor sits at one end of the roller tube, high in the head detail, and the supply has to reach that end. Arriving in the middle of the opening, at the wrong side, or at outlet height below the sill is the difference between a shade that looks built-in and one that has a cord.
How much of the house to pre-wire
All of it, if the walls are open. Choosing room by room means predicting today which windows you will want automated in ten years — after the nursery becomes an office, after the room you never sit in turns out to catch the afternoon sun — and that prediction is only ever wrong in the expensive direction. Wiring an opening does not commit you to motorizing it; it just means you can, whenever you decide to.
When to do it, and who to tell
The moment you are aiming for is electrical rough-in, between framing and drywall, when the electrician is already pulling everything else through the studs. It is also the cheapest possible time to ask rather than guess: the framing is visible and nothing is committed. Book a free consultation and we will go through the plans with you — tell us which openings are getting shades and roughly where each motor will sit, and we hand your electrician the supply type, termination point and mounting height for each one. Fabrics, colors and mount types can all wait months. The wiring cannot.
A new build in Sunnyvale
We were brought into this project while it was still beams and conduit, which is exactly the right moment. The house has tall staircase windows — the classic case for pre-wiring, since nobody was going to be recharging those twice a year — so we specified supplies at the head of each opening.
The staircase takes direct sun for most of the day, so the shades got a 3% solar fabric to cut the glare without losing the outlook, with black valances to match the slim black window frames. About a year from rough-in to handover.