Pre-Wiring for Motorized Shades: What to Do Before the Drywall

MotorizationUpdated Sep 17, 20265 Min Read

If your walls are still open, this is the cheapest hour you will ever spend on window treatments. Power at the window means shades that never need charging, nothing visible in the finished room, and no regret about the one window nobody can reach. Here is what to run, where, and when.

Pre-Wiring for Motorized Shades: What to Do Before the Drywall

The short version

Every motorized shade needs power, and there are only two ways to get it to the motor: a battery inside the shade, which wants a USB recharge every four to six months for as long as you own it, or a wire in the wall, which you never think about again. The wire costs almost nothing while the walls are open and a great deal afterwards — so the real content of this article is a deadline, not a technique: decide before the drywall goes up.

24V, PoE or 110V?

OptionWhat to runWhere it worksThe trade-off
24V low voltageA low-voltage supply terminating at the motor end of each openingEverywhere. It is what most of our Matter motors run on, it hides in a slim head detail, and it is safe to work around.Connectors and transformer placement vary by manufacturer — confirm the spec before it is run.
PoE (Power over Ethernet)A Cat6 run from the network rack to the motor end of each openingEverywhere, and further than low voltage can reach — a single run can cross the whole house. Our PoE motors take the cable directly, with no transformer or splitter in the head.It needs a PoE switch with enough budget for every motor on it, and it ties the shades to the network rack rather than a simple supply.
110V household powerA standard outlet at the head of the opening, concealed within the frameEverywhere too. This is not a capability limit — a 110V motor will do the same job at the same openings.It costs more per opening for almost nothing you do not already get from 24V: an electrician, a box and an outlet each time, and an outlet is bulkier to hide.

Why 24V rather than 12V

Low-voltage shade motors used to be 12V, and plenty of older installations still are. At double the voltage the same motor draws half the current, and halving the current buys two things that matter once the cable has to cross a house: it can be thinner for the same job, and it can be far longer before voltage drop starts to slow the motor at the end — roughly four times longer. On a 12V house that limit usually means several supplies scattered around to stay close to the openings. On 24V it is often one.
The same motor on 12V and on 24V. At 24V the motor draws half the current, so the cable can be thinner, and the run reaches about four times further before voltage drop matters — which usually means one supply for the house instead of several.What doubling the voltage buys youSame motor, same power. Half the current — so a thinner cable, and roughly four times the run before voltage drop matters.12VsupplyThicker cable for the same motor2nd supplyA second supply, partway along24VsupplyHalf the current, so thinner cableOne supply reaches the far cornerDrop scales with current and the allowance scales with voltage, so the usable length goes as the square — about four times as far.
Thinner cable, and about four times the reach before voltage drop bites — which is usually the difference between one supply and several.

Where the power has to land

This is the one detail worth getting exactly right, and it is geometric rather than electrical: the motor sits at one end of the roller tube, high in the head detail, and the supply has to reach that end. Arriving in the middle of the opening, at the wrong side, or at outlet height below the sill is the difference between a shade that looks built-in and one that has a cord.
Pre-wired, the supply arrives concealed in the head detail at the end of the tube where the motor sits. Without it, the nearest power is an outlet near the floor and the cord has to climb the wall in full view.Pre-wiredmotor sits at this end of the tubeconcealed inside the wallPower ends behind the bracket. Nothing shows.Not pre-wiredmotor sits at this end of the tubecord in plain viewThe only power is at floor level, on the wrong axis.
Say which end before anyone drills. Get it right at framing and none of it is ever visible again.

How much of the house to pre-wire

All of it, if the walls are open. Choosing room by room means predicting today which windows you will want automated in ten years — after the nursery becomes an office, after the room you never sit in turns out to catch the afternoon sun — and that prediction is only ever wrong in the expensive direction. Wiring an opening does not commit you to motorizing it; it just means you can, whenever you decide to.
A house with every opening fed from one supply while the walls are open, including the tall stairwell window. Wiring an opening does not commit you to motorizing it.One supply, every opening, while the studs are exposedsupplyin the rack
One supply, every opening — including the stairwell nobody can reach. While the studs are exposed the extra cable is a rounding error; afterwards it means opening a finished wall.

When to do it, and who to tell

The moment you are aiming for is electrical rough-in, between framing and drywall, when the electrician is already pulling everything else through the studs. It is also the cheapest possible time to ask rather than guess: the framing is visible and nothing is committed. Book a free consultation and we will go through the plans with you — tell us which openings are getting shades and roughly where each motor will sit, and we hand your electrician the supply type, termination point and mounting height for each one. Fabrics, colors and mount types can all wait months. The wiring cannot.
A build timeline from framing to handover. Pre-wiring is easy from framing until drywall, cheapest at electrical rough-in, and needs the wall opened again after that.The window opens at framing and closes at drywallFramingwalls openRough-incall us hereDrywallwindow closesPaintHandoverminutes per openingcut the wall open again
Rough-in is the moment to call. Everything after it gets harder.

A new build in Sunnyvale

We were brought into this project while it was still beams and conduit, which is exactly the right moment. The house has tall staircase windows — the classic case for pre-wiring, since nobody was going to be recharging those twice a year — so we specified supplies at the head of each opening.
The staircase takes direct sun for most of the day, so the shades got a 3% solar fabric to cut the glare without losing the outlook, with black valances to match the slim black window frames. About a year from rough-in to handover.

Frequently asked questions

WeChat
Opening Hours
Sunday
9.00 AM - 6.00 PM
Monday
9.00 AM - 6.00 PM
Tuesday
9.00 AM - 6.00 PM
Wednesday
9.00 AM - 6.00 PM
Thursday
9.00 AM - 6.00 PM
Friday
9.00 AM - 6.00 PM
Saturday
9.00 AM - 6.00 PM

Get a Free Consultation

Reach out to us immediately to arrange for a customised quotation from one of our assessors. Phone us or complete the form provided below!

Products